Energy Survey

The starting point for any Solar installation should be a comprehensive survey. This involves everything from interrogating previous energy bills, and studying the current electrical installation.

Following that will be the assessment of the roof for PV modules and the potential cable routing etc.

 

The process follows a typical path outlined below:

Survey and design process

1. We collect information to assess your load profile. This is crucial to getting the system sized correctly and the more information on hand, the better the accuracy of the assessment. 

2. We can often assess your roof from a distance using satellite imagery and our modelling software, Using the load profile we can simulate a range of proposals which can be optimised to focus on cost effectiveness.

3.  Once we have agreed upon a specification we can apply to the DNO (Distribution network operator) eg: National Grid, for the permission to install the system at your site.  

4. While we wait for the DNO application we we follow up with a more detailed survey to thoroughly check everything in the design will work with the exact situation found on site.  